Technical Reports
& Documentation

Comprehensive technical reports, project documentation, and engineering analysis by Omkar Kumar Sharma

Project Reports

Technical documentation, analysis reports, and project deliverables showcasing engineering expertise and attention to detail.

Final Year Project

College Parking Project

Government Polytechnic, Chhapar

Comprehensive design and cost estimation of a modern covered parking facility featuring robust steel structure with advanced GI roofing system for optimal weather protection and durability.

₹75,795

Total Cost

900 sq ft

Coverage Area

MS Steel

Structure Type

2-4 Wheeler

Vehicle Type
Weather Protection
Primary Safety Feature

Provide comprehensive protection from rain, sun, hail, and other adverse weather conditions for all parked vehicles, ensuring year-round usability.

100% rain protection UV ray shielding Hail damage prevention
Space Optimization
Maximum Efficiency

Maximize parking capacity while ensuring easy vehicle movement, accessibility compliance, and efficient traffic flow management.

Optimized layout design Easy maneuvering space
Cost Effectiveness
Budget Optimization

Design an economical solution that balances functionality with budget constraints while maintaining high quality standards.

Competitive pricing Long-term value
Structural Integrity
Safety Compliance

Ensure the structure meets all safety standards, IS codes compliance, and can withstand local environmental conditions effectively.

IS code compliance Seismic resistance
Structural Specifications
Component Material Dimension Specification
Main Trusses MS Steel 50 ft span ISLB 150 sections
Purlins MS Angles 18 ft length 75×75×6 mm
Columns MS Tubes 12 ft height 100×100×6 mm
Roofing GI Sheets 0.5 mm thick Corrugated profile
Foundation RCC 2×2×1.5 ft M20 grade concrete
IS 800:2007 (Steel Design)
IS 456:2000 (RCC Design)
IS 875:1987 (Load Standards)
NBC 2016 (Building Codes)
Detailed Cost Estimation
S.No Description Qty Unit Rate (₹) Amount (₹)
1 Excavation for foundations 12 m³ 150 1,800
2 RCC foundation (M20) 6 m³ 4,500 27,000
3 MS Steel structure (trusses, columns) 2.5 MT 65,000 16,250
4 GI roofing sheets with accessories 950 sq ft 25 23,750
5 Welding and fabrication 1 LS 8,000 8,000
6 Painting and finishing 1 LS 5,000 5,000
7 Labor charges 1 LS 12,000 12,000
Sub Total ₹69,800
Contingency (5%) ₹3,490
Contractor's profit (3%) ₹2,094
TOTAL PROJECT COST ₹75,795
Cost Distribution
Foundation Work 38.6%
Roofing Materials 31.3%
Steel Structure 21.4%
Labor & Services 17.2%
₹69,800
Base Cost
₹6,584
Overheads

Academic Documentation

Resume & CV

Professional resume with complete academic and project details

Download Resume
Portfolio

Complete portfolio with all projects and achievements

View Portfolio